Managing sociotechnical risks in infrastructure projects : Sociotechnical Systems (STS) perspectives on systems
Abstract
As systems become larger, more complex and integrated, the cost of failure increases
rapidly, leading to a need for effective risk management tools. However, conventional
risk management tools such as the ones based on hazard analysis or accident causation
analysis have a narrow focus on either human or technical actors and on single causal
chains at one organisational level. This led researchers to introduce the concept of
Sociotechnical Systems (STS), involving the interaction of human and non-human
technical components. The present study was conducted with the aim of developing
ways of applying STS principles and STS-based methods to improve the risk
management in large infrastructure projects. Initially, the sets of STS principles for the
system design, which had been developed so far, were identified and then integrated and
synthesised to produce a list of 20 core STS principles for applying them further in the
current study. A comprehensive literature review of the work done in this field since its
inception in the 1950s was then conducted, producing a unified list of 103 STS-based
methods. These methods were then evaluated for their validity and visibility
(occurrence).
To identify and analyse major risks in complex infrastructure projects from an STS
perspective, an observational case study of a large-scale collaborative design project at
Heriot-Watt University was conducted, including running the surveys and interviews
with the project participants. The aim was to find out if the presence or absence of the
20 STS principles and 18 associated risk factors affected the performance of the teams.
It was found that the team performance was strongly related to the presence or absence
of STS principles that was supported by statistically meaningful results of a quantitative
analysis. The same STS principles were then applied retrospectively to a second case
study, which was the construction of the Edinburgh Tram Network, based on
documentary sources and employing the AcciMap and Abstraction Hierarchy (AH)
methods. It was concluded that failure to apply these principles and the resulting risks
could play a major role in the failure to deliver the project on time and within budget.
Finally, a five-phase framework was constructed for STS-based risk management
framework of infrastructure projects, with the guideline principles aligning the existing
risk management framework with STS theory.